Snowfall continues in the stretch between Jawahar Tunnel to Patnitop.
The Jammu-Srinagar highway closed today after heavy snowfall on both sides of the Jawahar Tunnel.
Fresh snow accumulation details are
a. Snow accumulation at JT is 1.5 ft
b. Nowgam 1.5 ft
c. Banihal 8 inches
d. Ramsoo 2 inches
e. Ramban 2 inches
f. Peerah 2 inches
g. Nashri 3 inches
h. Batote 11 inches
I. Patnitop 2 ft
j. Kud 1 ft
k. Chenani 4 inches
2. Sliding spots details
a. Peerah
b. Mehar at three locations
c. Marog
d. Battery Chasma
e. Anokhi Fall
f. Digdol and
g. Khooni Nala
The post Jammu-Srinagar highway closed ,Fresh snow accumulation details appeared first on JKALERTS | Jammu and Kashmir Alerts and Updates.